Termite protection on a new Mambourin home
Collars, barriers and the meter box notice, and when each can be checked.
In short: Termite protection is installed early and hidden fast. Here is when each part can be seen.
Is it required?
It depends on your building permit and whether the land is designated under the Building Regulations. A Wyndham property information certificate shows it.
At slab
Collars on plumbing penetrations go on before the pour. We have recorded them missing on a Mambourin slab.
At frame
Physical barriers under external walls are visible at frame. A Mambourin frame had none at inspection.
The notice
A durable notice in the meter box records the system. Missing notices have come up at slab and at resale.
After you move in
Keep garden beds clear of the slab edge and book regular timber pest inspections.
Written by our local inspection team from work carried out in Mambourin. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.


